Picture 28
This is the other end (north end) that will slide into the existing exhaust pipe from the previous GEET reactor setup. I've made sure this hole is the same size so this can slide into position perfectly, like the previous fabrication.

arrowBack (1K)Previous Picture arrowNext (1K)Next Picture