Nicely glued into place ready for the assembly and test. Better to wait a day before torquing things together though. At this point I will make a permanent mark on the outside of the case where the top of the electrodes should be, approximately 1/4 inch below the bottom of the toroid coil. This way we can measure the distance from the top of the electrodes to the edge of the end cap where the electrodes are JB Welded into place. Using this measurement we'll know for sure where the top of the electrode tubes are so we don't over tighten the unit and possibly force the electrode tubes into the toroid coil. We'll use a generous amount of Teflon tape to prevent possible leaks and to facilitate removing things later should we have to disassemble it later for service or replacement of parts like the electrodes or float switch.