Picture 60
Placing the freshly coated with non-hardened epoxy toroid coil into the CPVC tube. Here I am making sure the wires are located near the holes I've already drilled in the case. This way I can place the wires through the holes before the epoxy hardens. My goal here is to add a couple more coats of epoxy to this while in place inside the CPVC tube to seal it and lock it securely in place. As a side benefit the wires will be sealed into place preventing them from damage from vibrations.

arrowBack (1K)Previous Picture arrowNext (1K)Next Picture