Picture 30
In this assembly into the end cap the drain hole had been already drilled so lining up the center set of CPVC pieces was easy. None-the-less I laid it out and marked a guideline around the OD of the piece with a marker to be sure to get it dead center. Once I properly cleaned the pieces with cleaner and cemented them properly into place I used a proper sized container, in this case an empty vitamin bottle, to hold it in place. I finally found a good use for that substandard Chinese made pipe expander. It's heavy enough to keep good pressure on the pieces until the cement dries.

arrowBack (1K)Previous Picture arrowNext (1K)Next Picture